A renovation produces two kinds of waste at once: the rubble of the building work, and the old kitchen, bathroom suite, doors and flooring that come out first. It helps to know which you have before you request a quote.
What usually comes out
- rubble: concrete, brick, blocks, tiles and ceramics;
- plasterboard from walls and ceilings;
- timber: doors, skirting, floorboards, kitchen units;
- old fittings: bath, toilet, sink, worktops;
- packaging from the new materials.
One collection or several
On a long job, waste builds up in stages. Say whether you want one collection at the end or several during the work, and whether there is room on site for the waste to wait.
If your builder is doing the work
Ask whether the builder's quote already includes taking the waste away. If it does, you may not need a separate company.
Before the job
Ask the company for its waste collection permit number and where the waste will be taken.
Questions
Should I separate the rubble from the rest?
If you can, yes. Say in the request whether the load is clean rubble or mixed with plasterboard, timber and other materials.
Can I use a skip instead?
You can. If the skip goes on a public road, check whether your council requires a permit.